← Back to MOIZ Toolbox
MOIZ Toolbox — quick guide

Configure

Commission the device, set LoRaWAN identity, then refine application settings.

Home — quick commissioning

After Connect, stay on Home. Choose a typical application tile, or use Fast commissioning (ports + uplink period + frequency plan). Always review, then Apply.

Guided write to the device over USB.

LoRaWAN network (before first join)

Open Network. Set JoinEUI, AppKey, and region / frequency plan. These keys are set over USB only — not by LoRaWAN downlink.

Match the values registered on your LNS.

Other pages (when you need them)

Application

Mode MONITORING / ALARM, port types, uplink period, power options.

Alarms

Thresholds and timing when Application is in ALARM mode.

Calibration

Per-port curve / presets; Apply writes the LUT to the device.

Import / Export

Clone configs with .hvt.json (network keys are never exported).

Expert settings after a Home commissioning.
Port tabs and live preview.
Pattern

On every expert page: Load → edit → Apply.

Next: Check live data & update firmware →